Professional PR Commercial Photography

Energyst Cat Rental Solutions

This year saw a colossal achievement for Energyst CAT Rental Solutions when they installed a 1250kVA power generator and transformer package onto the P&O Cruises ship Oriana. The loading of the tailored marine-specified 660-voltage generator commenced in the early hours just after the P&O cruise ship docked in Southampton at 5am on 27 May. When in position the generator was welded to deck 13. Two Energyst engineers sailed with the ship to complete the installation of the oil and gas generator to ensure the cruise itinerary was adhered to.

Full details – www.energyst.com/uk/po-cruises-oriana

On Location Events were commissioned to photograph the installation, an overview of images – www.onlocationevents.zenfolio.com/p763884523

Commercial PR / Press photography – www.onlocationevents.co.uk

Categories: On Location Events